HV Decking System

HV Panel Decking System

HV Decking System

GALLERY

 

Description

The HV Decking System provides rapid, versatile and efficient means of casting in situ concrete decks in a wide variety of applications.

Lightweight and easy to use, the HV Decking System comprises just 3 main components and can be erected and dismantled by a team of two operatives without the need for special tools, making it one of the least labour intensive systems on the market. With all erection and dismantling undertaken from beneath the deck itself, the system minimises requirements for working at height and makes a major contribution to site safety.

Stripping made easy: Our HV drophead allows all the components to be removed while leaving the props undisturbed while taking the load of the slab above. The removed components can then be utilised elsewhere limiting the amount of equipment required on site.

HV Decking

Minimal storage area: The HV system stacks easily into stillages, wheels can be supplied or use a pallet trolley to move the neatly stacked equipment into the next section or into a hoist for the next level.

HV Decking

Safety: The design of HV grid allows great access and uncluttered workspaces.

HV Decking

Flexibility: The HV system can work around every scenario, e.g. Lift shafts, columns and beams. The HV system allows the removal of bays to accommodate deck access. The deck is easily finished off when required by simply replacing the removed panels.

HV Decking

 

BENEFITS

  • Lightweight components facilitate rapid erection and dismantling
  • Enhances safety on site
  • Minimises labour requirements and costs
  • Self-sets to save time
  • Early stripping maximises equipment re-use
  • Single panel with GRP synthetic cover obviates need for ply
  • Continual back-propping improves productivity